Skilled Craftsman with Attention to Detail
Consulting

Outsource



IDF Upgrade Process

At this point we added some cable support elements and re-dressed the cabling into the new pathway resolving the code violations. We than re-terminated the cabling to the new patch panels.
Phase Five

Install Sample
Installation shows a properly dressed cabling system leaving a service loop withing the vertical wire management.